Vicksburg Bridge
Fast Track Hydrodemolition and Latex Modified Concrete A project to rehabilitate various features of the Mississippi River Bridge on I-20 at Vicksburg, MS is ongoing through 2020. The work includes major structural repairs to the bridge superstructure and upgrades to …
Fast Track Hydrodemolition and Latex Modified Concrete – Baltimore Harbor Tunnel
A deck repair project administered through the Maryland Transportation Authority (MdTA) at the Baltimore Harbor Tunnel on I-895, was recently completed by Swank Construction Company from New Kensington, PA. A major focus of the job was the restoration of the …
Hydrodemolition of the Toledo Skyway Bridge
Largest Fast Track Selective Hydrodemolition project ever performed in Ohio. Even with the Coronavirus gripping the country, it has not deterred the transportation industry from charging on. Bridge deck rehabilitation is a big part of that, as preservation has been …