• 812-28-HYDRO
  • 6200 E Hwy 62, Bldg 2501 Ste 300, Jeffersonville, IN 47130
  • eliberati@hughesgrp.com

Fast Track Selective Hydro-Demolition Method

Featured Projects

Liberty Tunnel Hydro-Demolition

Milling in Preparation of Fast-Track Selective Hydro-Demolition

Fast-Track Selective Hydro-Demolition

Latex Modified Concrete for Bridge Preservation

[testimonials style=”style-1″ testimonialheading=”Testimonials”][testimonial user_name=”INDOT – Charles A. Jenson”]I just wanted to drop you a note to express my satisfaction on the excellent job that Hydro-Tech performed on our Contract. The Borman Expressway (I80/94 in Lake county has the highest traffic volume of any road in the state (160,000 vehicles per day) and is the 5th most traveled truck route in the United States. [/testimonial][testimonial user_name=”INDOT – Dennis A. Kuchler”]The hydro-demolition process that you used on contract R-22921 for removal of the unsound bridge deck concrete worked well. It meets very well the Indiana Department of Transportation’s (INDOT) requirements stated in section 722.05 “Preparation of the Bridge Floor” of our standard specifications. [/testimonial][testimonial user_name=”BASF Letter”]For the past 30 years throughout the United States Latex Modified Concrete overlays have been successfully placed on bridge decks which were prepared through the use of Hydro-demolition. We strongly believe that the use of Hydrodemolition for surface preparation is the fastest and most effective way to prepare a bridge deck for a new Latex Modified Concrete (LMC) overlay.[/testimonial][testimonial user_name=”Commonwealth of Kentucky Transportation Cabinet I”]After observing the hydro-demolition and inspecting the surface for unsound concrete and resteel integrity this office was very satisfied with the demolition process. This method removed all the unsound concrete, cleaned the resteel and provided an excellent bonding surface. This process also kept pace with the fast tracking which was required by the project and was a big part in the contract being finished early[/testimonial][testimonial user_name=”Commonwealth of Kentucky Transportation Cabinet II”]In my 19-year career, I have seen and have been associated with many projects that I consider to have been excellently planned, well executed, and the finished product to be of excellent quality. This project, however, stands out from any other I have been associated with……On this project I witnessed a total commitment to the project goal and pride in seeing your part done to the highest standard possible[/testimonial][testimonial user_name=”Tennessee Department of Transportation I”]I would recommend the use of hydro-demolition as an excellent tool in the removal of deteriorated concrete on bridge decks and the use of latex overlay as a excellent means of sealing a bridge deck. I would also like to say that I have been most satisfied with the work Hydro-Technologies has performed in the state of Tennessee and look forward to working with you on future projects.[/testimonial][/testimonials][button link=”http://www.hydro-technologies.com/testimonials/” size=”medium” style_button=”btn-normal”]See Full Testimonials[/button]